Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4809817 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Cooling Appliances And E/m Equipment At Af Stn Tughlakabad Under Ge (af) Tughlakabad |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 01 Aug, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 222800.00 |
| Estimated Cost | 14776000.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 10 sq mm 4 core complete all as specified and as directed. | 1126.00 | Running Meter |
| 2 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm 4 core complete all as specified and directed. | 350.00 | Running Meter |
| 3 | Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 50 sq mm 4 core complete all as specified and directed. | 300.00 | Running Meter |
| 4 | Material and Labour in replacement for galvanised Pipe of dia 100 mm, 'light grade' with all fitting,laid in trenches for passing of cable etc. all as specified and directed. | 30.00 | Running Meter |
| 5 | Excavation in trenches in soft/loose soil not exc 1.50 mtrs wide and not exc. 1.5 mtr deep and getting out for taking out/laying cable pole &stay etc including taking out old precast concrete cover complete. Note - If damage during excavation (such as the pressure pipe line, electric cable HT/LT, water pipe line, fire hydrant pipe line AF net etc) repair the same day and restore the supply without any extra cost and making good the disturbed surface all as specified and directed. | 239.76 | Cubic Meter |
6 Days Left