Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3882512 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maintenance Of Dg Sets Ro Plants Control Panels Earthing System Street Lights Alongwith Connected Items For Water Supply Installations Under The Aor Of Age U Water Supply No I Under Ge U Water Supply Delhi Cantt 10 |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for Periodical mainteneance of DG Sets for proper functioning as per manufacturer's recommendations of following capacities of Make : Kirloskar/Greaves/ Mahindra/Cummins/Ashok Leyland all as per existing site by replacing Filters (Fuel filter, Lube Oil Filter, By Pass Filter), Air Cleaner both inner and outer element, Water seperator, Engine oil of suitable grade as per OEM recommendation upto upper level, Checking for diesel leakage and Cleaning of Diesel Tank thoroughly, Cleaning of Radiator after removing of old coolant completely with water and suitable radiator Cleaning agent, Oiling and Greasing of Engine Parts, Checking of all hose pipes, tightening of all pipes, cable conncections, Cleaning and Servicing of alternator, Cleaning of Exhaust Pipe, Silencer including checking for leakage of smoke alongwith replacement of minor spare parts if any, complete all as specified and directed by Engr-in-charge. Note :- (i) Rate Quoted shall include the cost of distilled water for batteries and Fuel filters, Lube oil filters, By pass filter, Air filter and minor spares. (ii) Engine Oil and Coolant shall be measured and paid separately under respective items. | ||
| 2 | DG Set 30 to 50 KVA Capacity | 3.00 | EACH JOB |
| 3 | DG Set 62.5 to 82.5 KVA Capacity | 10.00 | EACH JOB |
| 4 | DG Set 100 to 125 KVA Capacity | 7.00 | EACH JOB |
| 5 | DG Set 160 to 200 KVA Capacity | 3.00 | EACH JOB |
10 Days Left