Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4982335 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maintenance Of Electrical Breakdown Inc Fault Detection Localization And Rectification In Underground Network At Bi Line Abdul Hamid Vihar Abdul Hamid Vihar Family Qtr Arjan Vihar Pratap Chowk Area Mandir Marg Ahpu Tauras Enclave Aepta |
| Last Date For Submission | 13th Aug, 2026 |
| Opening Date | 15 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 94000.00 |
| Estimated Cost | 4700000.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material & labour for excavation in trenches not exceeding 1.5 metre wide & not exceeding 1.5 meter in depth for foundation, laying of cable or pipe (where provided for protection of cable or fixing with poles and stays) and getting out in any type of soil including trimming the sides and forming bottom surfaces to required levels complete all as specified and directed by the Engr-in-Charge. | 737.64 | Cum |
| 2 | Material & labour for returning filling in, Including spreading, levelling, Watering and well ramming soil in layers not exceeding 25 cm thick complete all as specified and directed by the Engr-in-Charge. | 456.98 | Cum |
| 3 | Material & labour for removal excavated material (ie soil) from site to a distance n. exc 50 mtrs away and depositing where directed at a level n. exc. 1.5 mtr above the starting point complete all as specified and directed by Engr-in-Charge. | 280.67 | Cum |
| 4 | Material and labour for river washed and screened, dry sand for filling in trenches below and around underground cables for cushioning of cables etc,complete all as specified and directed by the Engr-in-Charge. Note : Measurement shall be taken after punning down. | 196.99 | Cum |
| 5 | S&F sub class B bricks having minimum compressive strength 75 Kg/ Sqcm laid in trenches for cable protection etc complete all as specified and directed by the Engr-in-Charge. | 9.81 | Per 1000 Nos |
6 Days Left