Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4784169 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair Maint Of Transformer Ht Lt Switch Gears Alongwith Connected Accessories At Hq Ids Under Ge New Delhi |
| Last Date For Submission | 28th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 18000.00 |
| Estimated Cost | 900000.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M & L for Disconnecting and Servicing of Transformer of rating 1000 KVA transformer,11 KV / 433 V Dry type Transformer with OLTC Service (Air cooled), disconnecting all Internal Connections of HT/LT Side for Periodical Maintenance, air blowering, Nut bolt tightness, Core Clamp Tightening, Cleaning with CTC HT and LT Insulator etc. and then after asembling to all complete all as specified and as directed. Protection Check :- WTI Alarm, WTI Trip and Door Open Trip Check. Testing of Transformer :- IR Value Voltage Ratio Magnetic current balance Magnetic Voltage balance Continuity Test Lamp series Test High Voltage Test | 1.00 | Each Job |
| 2 | M & L for Disconnecting and Servicing LT ACB of capacity 800 Amps to 2000 Amps by disconnecting from the busbar and cleaning with air blowering CRC, CTC, Grease, B nut-bolt tightening replacing all unserviceable parts of finger contact with male female set and wiring with new copper conductor cable of 2.5 sq mm. Replacing the U/S mechanical spring system, fixed and moving contacts, replacement of bearing of spring charge motor. complete all as specified and directed. Note : Replacement of spares such as Selector switch, fixed Arc contact, moving Aec contact, Auxiliaey, motor Mechanism, control Fuses HRC type paid seperetely and all the items mentioned below are tentative and may vary in specification and quantity during execution | 1.00 | Each Job |
| 3 | S&F in repair of Fixed Arc Contact- 3 pole suitable for existing ACB Panel as per existing make complete all as specified and directed. | 1.00 | Each |
| 4 | S&F in repair of Moving Arc Contact- 3 pole suitable for existing ACB Panel as per existing make complete all as specified and directed. | 1.00 | Each |
| 5 | S&F in repair of Auxiliary contact 4 No+ 4 NC suitable for existing ACB Panel as per existing make complete all as specified and directed. | 1.00 | Each |
6 Days Left