Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Delhi Development Authority
Tender ID4181777
Organisation NameDelhi Development Authority
Tender BriefCorrigendum : Repair Of Peripheral Existing Storm Water Drains In Sec- B-2, Narela.
Last Date For Submission16th May, 2026
Opening Date18 May, 2026
Cost
Document Cost0.00
EMD56345.00
Estimated Cost2817242.00
Location
CityDelhi
StateDelhi

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavating, supplying, stacking and filling of local earth (excluding royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.205.000Cum.
2Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.25.500Cum.
3Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)47.000Cum.
412 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)367.000sqm
5Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. (a) All works upto plinth level: Concrete of M30 grade with minimum cement content of 350 kg /cum64.970Cum.
16th May, 2026

4 Days Left

WhatsApp