Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3750691 |
|---|---|
| Organisation Name | State Agricultural Marketing Board |
| Tender Brief | Corrigendum : Supply, Installation, Testing And Commissioning Of Slow Speed Weigh In Motion Sswim Ic Comprehensive Maintenance For 05 Years 1 Plus 4 Years At Nsm Entry Gate Of F And V Mni Azadpur. |
| Last Date For Submission | 2nd Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 57675.00 |
| Estimated Cost | 2883706.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SITC of pit mounted slow speed weigh in motion (SSWIM) system operates at lower vhicle speed with following technical specifications Hybrid Bending Plate Size 1500mm X 620mm, Number of Hybrid Bending Plates per lane 2 Nos.(For Standard 3 M wide lane), Capacity of the platform 30 Ton/Axle, In Motion Error upto 3% on FSR, upto speed 15 Km/h, Number of load cells per Lane 4, Type of Load Cell Double Ended Shear Beam, Capacity of load cell 15t each, Load Cell mV Output 2mV/V, Safe Over Load - Load Cell 150% of rated capacity, Ultimate Overload 200% of rated capacity, Material of construction Load Cell Stainless Steel, Protection class for Load cell IP 68, Protection class for Controller/Indicator IP 67, Communication TCP/IP (Built-in Ethernet Port), Calibration Factory calibrated, Re- calibration/Stamping & verification Every 12 months, Vehicle Separator Infra-Red sensors based, housed in weather protected housing, Direction Detection by Vehicle Separator Forward and Reverse. It includes lane Module Software license & integration (one time + annual support) for SSWIM system incorporating the RFID information (Vehicle details, etc..), raising alerts for black listed vehicles in market yard, integrating the ANPR Cameras etc complete as required, Loop detector with sensors for reversible system, DIO Card (Digital Input Output Interface), 8F UNI-TUBE optical fiber cables single mode , reporting Module Software for integration of whole system at one plateform complete as required. | 2.00 | Job |
| 2 | Comprehensive Maintenance of 1st year after liability period of One year | 1.00 | Year |
| 3 | Comprehensive Maintenance of 2nd year | 1.00 | Year |
| 4 | Comprehensive Maintenance of 3rd year | 1.00 | Year |
| 5 | Comprehensive Maintenance of 4th year | 1.00 | Year |
5 Days Left