Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Delhi Development Authority
Tender ID4277549
Organisation NameDelhi Development Authority
Tender BriefMaintenance of Aravali Bio-diversity Park Including Neela Hauz.
Last Date For Submission16th May, 2026
Opening Date16 May, 2026
Cost
Document Cost0.00
EMD56966.00
Estimated Cost2848287.00
Location
CityDelhi
StateDelhi

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.55.00Cum
2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)22.00Cum
3Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in- charge.4950.00sqm
4Preparation of 50mm thick Morrum path including supplying and stacking, spreading, watering and ramming, consolidating with road roller all complete as per direction of Engineer-in-charge.4950.00sqm
5Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).45.00Cum
16th May, 2026

Closed

WhatsApp