Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4269556 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Repair Maintenance of Of Ei And Fans Installed At District Court Complex , Saket , New Delhi (sh Comprehensive Maintenance Of Ro/ Filtration Units And Allied Accessories) |
| Last Date For Submission | 21st May, 2026 |
| Opening Date | 21 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 56803.00 |
| Estimated Cost | 2840170.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Annual Comprehensive Maintenance of Water Cooler with inbuilt UV of ATSIN Make with Capacity 150 Ltr Storage and 150 Ltr Cooling Capacity and three stages ultra violet based purification system for operation and connected with water tank consisting of three mandatory Services and cleaning as and when required basis , Repair/Replacement of all electrical and electronic spare parts like speed pump, solenoid valve , high pressure switch , float switch and One Time Replacement of Consumables item i/c water cooler tray but except Gas Charging and attending complaints within 24 working hours with complete overhauling and servicing etc as reqd (7 Nos For 12 Months) | 84 | job |
| 2 | Annual Comprehensive Maintenance of Water Cooler with inbuilt RO+UVof ATSIN Make with capacity 80 Ltr Storage Capacity and 60 ltr cooling capacity with 50 LPH RO System connected with water tank consisting of three mandatory Services and cleaning as and when required basis, Repair/Replacement of all electrical and electronic spare parts like Pump , Solenoid Valve, high pressure Switch , float switchand including One Time Replacement of Consumables item i/c water cooler tray Except Membrane and Gas Charging) and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd (9 Nos For 12 Months) | 108 | job |
| 3 | Annual Comprehensive Maintenance of Water Cooler with inbuilt UV of ATSIN Make with Capacity 80 Ltr Storage and 60 Ltr Cooling Capacity System connected with water tank consisting of three mandatory Services and cleaning as and when required basis, Repair/Replacement of all electrical and electronic spare parts like Pump , Solenoid Valve, high pressure Switch ,float switch and including One Time Replacement of Consumables item i/c water cooler tray Except Gas Charging and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd(3 nos For 12 Months) | 36 | job |
| 4 | Annual Comprehensive Maintenance of Hot, Cold & Normal Water Dispenser with inbuilt RO+UV of ATSIN Make connected with water tank consisting of three mandatory Services and cleaning as and when required basis,Repair/Replacement of all electrical and electronic spare parts like Pump , Adaptor , Solenoid Valve and High Pressure Switch and including One Time Replacement of Consumables item but Except Membrane and Gas Charging) and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd.( 4 Nos For 12 Months) | 48 | job |
| 5 | Annual Comprehensive Maintenance of Hot , cold & Normal bottle Type Dispenser of ATSIN Make connected with water tank consisting of three mandatory Services and cleaning as and when required basis like repair/Replacement of all electrical and electronic spare parts and including tank cleaning and wiring etc (Except Gas Charging) and Attending complaints within 24 working hours with complete overhauling and servicing etc as reqd. (2 Nos For 12 Months) | 24 | job |
Closed