Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4078735 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Running Maintenance And Operation Of Electrical And Mechanical Services, Pump Set, Diesel Generator Set And Passenger Lift Installed At College Of Art, Tilak Marg, New Delhi (sh - Comprehensive Maintenance And Operation Of Stac/wtac, Water Cooler And Vrv Centrali |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 53817.00 |
| Estimated Cost | 2690874.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Servicing, operation & comprehensive maintenance of following capacity Split/ Window/ Cassette type AC units & Water Coolers of different makes including cleaning, washing from high pressure water spray electric machine, coil cleaning with van clean chemical and make system dry from air blower, oiling, greasing, replacement of defective blower, indoor/ outdoor motor, compressor, PCB, plug top, remote, starting/ running capacitor, starting relay, thermostat, propeller fan, condenser coil, cooling coil, drain pipe, condenser motor, gun metal water tap, float valve, 3 core copper conductor cable, charging of refrigerant gas complete with testing and commissioning including credit for old dismantle material, as per term & conditions and Inventory-I & II attached complete etc. as required. 1.1) STAC/ WTAC/ CTAC of 1.5/ 2.0/ 3.0TR capacity - (110 Nos.) | 9.00 | Months |
| 2 | 1.2) Water Cooler of 100/150 Ltrs. - (5 Nos.) | 9.00 | Months |
| 3 | Routine maintenance & operation and general upkeep of various LG make VRV Air Conditioner unit alongwith associated accessories/ switchgears and 4 Nos. ventilation system etc. and carrying out the daily drill comprising of cleaning of above installation and maintaining log book & periodical checking of above installation, keeping the entire installation on functional mode and minor repairing & servicing of the complete system & outdoor units, AHUs, control panel/ventilation system by deploying following staff on all working days excluding Sunday & Holidays as per terms & conditions etc. as required. (a) AC Mechanic - 1 No. (b) Khallasi - 1 No. | 12.00 | Months |
| 4 | Comprehensive maintenance including repair and replacement of unserviceable spare parts including compressor and routine preventive maintenance of complete VRV Centralized Air Conditioning System of LG make along with other associated accessories etc. The scope of work consisting of providing tools and tackles, spares parts, equipment s, consumables items for smooth and uninterrupted working of the complete system as per terms and condition attached and inventory attached complete as required. (162HP) | 12.00 | Months |
4 Days Left