Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4860543 |
|---|---|
| Organisation Name | Delhi Jal Board |
| Tender Brief | Tracing And Plugging/repair Of Various Leakages In 1200mm Dia Jal Vihar Mains And Branch Line Emanating From Bhagirathi Wtp. |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 45200.00 |
| Estimated Cost | 0.00 |
| City | Delhi |
|---|---|
| State | Delhi |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Day to day maintenance of water supply by Plugging of various leakages occuring time to time in PSC Jal Vihar mains 1200mm dia,Shahdara OHT main 600mm dia, Shalimar park UGR main 450mm dia, Vishkarma park UGR main 800mm dia,Dallupura UGR main 700mm dia, Mandawali II UGR main 600mm dia, 600mm dia Jal vihar main from Laxmi nagarchungi to Trilokpuri UGR, BD block 250mm dia, E block,Mayurvihar pocket V,Mayurvihar OHT phase II ,Mayur vihar pocket IV, Mayur vihar 124, Mayur vihar 176 mains and its other mains of various size at site with the help of menpower& material like Fitters, Helpers, Beldars, Supervisiors,Chokidar, Electricionetc, with hydraulic excavator etc. with Transportation for To &Fro including loading and unloading at site. Work will be execute as and when directed by Engineer-in-charge. (Only for PSC pipelines excluding gap-piece work) | 18.00 | Shifts |
| 2 | Day to day maintenance of water supply by Plugging various leakages occuring time to time by fixing of MS- plate/ MS coller/ MS welding work etc. in MS Jal Vihar mains 1200mm dia,Shahdara OHT main 600mm dia, Shalimar park UGR main 450mm dia, Vishkarma park UGR main 800mm dia,Dallupura UGR main 700mm dia, Mandawali II UGR main 600mm dia, 600mm dia Jal vihar main from Laxmi nagarchungi to Trilokpuri UGR, BD block 250mm dia, E block,Mayurvihar pocket V,Mayurvihar OHT phase II ,Mayur vihar pocket IV, Mayur vihar 124, Mayur vihar 176 mains and its other mains of various size at site with the help of menpower& material like Fitters, Helpers, Beldars, Supervisiors,Chokidar, Electricionetc, with hydraulic excavator etc. with Transportation for To &Fro including loading and unloading at site. Work will be execute as and when directed by Engineer-in-charge. (Excluding MS- Gappiece work & Job work at Sr. no. 01) | 14.00 | Shifts |
| 3 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.(lump sum basis) | 6500.00 | KL |
| 4 | Providing lead caulked joints to spun yarn or C.I. pipes and specials, including testing of joints but excluding the cost of pig lead (average). (For works at Sr. no. 1, if required at site) | 14.00 | Jobs |
| 5 | Hiring of 100/125 KVA heavy duty DG set at site with fuel and operator.(if required at site) | 6.00 | Shifts |
7 Days Left