Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: State Building Construction Corporation Limited
Tender ID4247458
Organisation NameState Building Construction Corporation Limited
Tender BriefBeautification Of Children Park Locate At Jalsar Pond Under Deoghar District
Last Date For Submission1st Jun, 2026
Opening Date02 Jun, 2026
Cost
Document Cost10000.00
EMD649000.00
Estimated Cost0.00
Location
CityDeoghar
StateJharkhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I.3,060.95CUM
2Filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume).615.53CUM
3Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume)120.89CUM
4Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume)185.04CUM
5Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I.268.94CUM
1st Jun, 2026

20 Days Left

WhatsApp