| 2 | Jobs to be done: 1.Both side footrest cutting, welding, repairing and straightening.2.Both side door removing, damage portion denting, welding, repairing with door lock and handle changing and fitting.3.Both side cabin wheel mudguard cutting, welding, repairing, damage sheet replacement and fitting.4.Front bumper cutting, welding and repairing, straightening.5. Front both side H.L. Show mudguard cutting, denting, welding, repairing, damage sheet replacement.6.Rear back mudguard cutting, welding, repairing, straightening and damage sheet replacement.7.Rear and front footrest rubber changing, fitting, with bolt nutt cutting, changing and fitting. 8.Complete diesel tank damage portion MS Sheet cutting, new MS Sheet changing, welding, denting, straightening, repairing and fitting.09.Diesel tank bracket cutting, new bracket fitting, welding and repairing.10.Driver and co-driver sheet frame M S Sheet cutting, rusted sheet replacement. 11.Complete vehicle painting.12.Complete letter writing with logo and number plate.13.Both side cabin core mudguard cutting and changing, fitting with bolt nut cutting, changing and fitting.14.Both side cabin door glass with machine removing, machine greasing, fitting and setting.15. Both side Cabin door quotter glass with rubber, door pad removing, changing and fitting. 16. Wiper motor complete removing, overhauling with arm and blade replacement. 17. Battery box cutting, welding, repairing and refitting with cover making (slider type). 18. Both side king pin overhauling, raimring and fitting. 19. King pin axle beam complete dismantling, fitting with all accessories removing, fitting from chassis. 20. Both side king pin axle beam raimring, facing king pin over size. 21. Both side king pin spindle bush fitting, raimring and fitting. 22. Front wheel spindle shaft welding, making, repairing bearing size by steel electrode. 23. Front wheel hub drum refacing. 24. Rear complete differential overhauling, differential body tail bearing portion repairing for machining, Tail pinion flange new socket making through machining. 25. Both side cabin mounting removing, changing and fitting. 26. Complete steering system dismantling, overhauling and required materials changing & fitting. 27. All head light, back light, Ignition switch, horn etc. to be replaced. 28. Load body back dalla Tail gate Pin, bush removing, changing & fitting. 29. Brake tradle valve removing, overhauling and fitting. 30. Air control valve removing, overhauling and fitting. 31. Air relay valve removing, overhauling and fitting.
Repairing work should be completed with all required materials and manpower.
| 1.000 | Nos |