Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4035501 |
|---|---|
| Organisation Name | Himachal Pradesh Tourism Development Corporation |
| Tender Brief | Additional Work Of Upgradation Of Food Craft Institute To State Institute Of Hotel Management At Khaniyara Dharamshala Distt. Kangra (h.p) |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 04 May, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 8500.00 |
| Estimated Cost | 422920.00 |
| City | Dharamshala |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 2288.74 | Per Kilogram |
| 2 | Providing and fixing of class 33/AC-5 Pre-laminated wooden floor HDF 12mm thick Density min 850 kg/m3 of class d cor laminate min of 0.4 mm of overlay of melamine based paper with abrasion resistance cycle _>6000, impact Resistance IC in IC3 for 33th class, Scratch Residence EN438>3.5: satin resistance Class -5 thickness swelling _< 18% height difference max _>0.15mm with edge tolerance to 0.5-1.0 mm /mtr with underlay armor as desired 0.8-1.0 mm thick, surface soundness >1.25 N/mm of approved make as per direction of the Engineer-in-Charge including carriage of materials within all leads, lifts and heights. | 24.51 | Per Square Meter |
| 3 | Providing and fixing 8mm thick Particle board (BWP Phenol bonded exterior/ interior grade) of approved make as per direction of the Engineer-in-Charge including carriage of materials within all leads, lifts and heights. | 192.84 | Per Square Meter |
| 4 | Providing and fixing G.I. Metal Ceiling P/Coated white 1.8mm perforated lay in 595x595x0.5mm Tegular tiles with 24mm plain grid and suspension system complete in all respect as per direction of the Engineer-in-Charge including carriage of materials within all leads, lifts and heights. | 60.27 | Per Square Meter |
16 Days Left