Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4860518 |
|---|---|
| Organisation Name | Himachal Pradesh Tourism Development Corporation |
| Tender Brief | Construction Of Prefab Structure For Hptdc Cafe At Auhar Distt. Bilaspur (h.p) |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 150800.00 |
| Estimated Cost | 7539200.00 |
| City | Dharamshala |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation work of all kind of soil by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils within all lead and lifts as per the diretion of Engineer in Charge at site. | 66.82 | Per Cubic Meter |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 28.13 | Per Cubic Meter |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 29.76 | Per Cubic Meter |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 10.05 | Per Cubic Meter |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 9.29 | Per Cubic Meter |
15 Days Left