Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4032696 |
|---|---|
| Organisation Name | Himachal Pradesh Tourism Development Corporation |
| Tender Brief | Restoration Of Damage Due To Heavy Rain During July 2023 At Hotel Giriganga Khadapather Distt. Shimla Hp |
| Last Date For Submission | 24th Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 1200.00 |
|---|---|
| EMD | 17800.00 |
| Estimated Cost | 889394.00 |
| City | Dharamshala |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all leads and lifts, as directed by Engineer-in-Charge at site. Ordinary rock | 24.45 | Per Cubic Meter |
| 2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a all leads and lifts as per the diretion of Engineer in Charge at site. Ordinary rock | 9.42 | Per Cubic Meter |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per the diretion of Engineer in Charge including carriage of materials within all leads, lifts and heights. | 1.36 | Per Cubic Meter |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 3.22 | Per Square Meter |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 cement : 6 fine sand : 12 graded stone aggregate 40 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 1.46 | Per Cubic Meter |
6 Days Left