Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3978916 |
|---|---|
| Organisation Name | Public Works Roads Department |
| Tender Brief | Corrigendum : Construction Of Road From Dirpai Nlgr Road At Panbari To Raiting Via Balisori Jiadhalmukh In Dhemaji District Under Crif For The Year 2025-26. |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 30000.00 |
|---|---|
| EMD | 18186280.00 |
| Estimated Cost | 909314000.00 |
| City | Dhemaji |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm thickness.(i) By Manual Means (a) In area of light jungle | 26.040 | Hect |
| 2 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres) | 9627.81 | cum |
| 3 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.) | 57063.75 | Sqm |
| 4 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( including compensation of earth.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) ' (a) from private land | 210692.95 | Cum |
| 5 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) from private land | 43786.03 | Cum |
2 Days Left