Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4444554 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of New Ri Office Cum Residence Building At Kunua Under Hindol Tahasil In The District Of Dhenkanal |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 77530.00 |
| Estimated Cost | 7752695.00 |
| City | Dhenkanal |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation & plinth in all kinds of soil including all leads and lifts with leveling , dressing the bed and depositing the excavated materials away from the work site with cost of all labours & T.&P. etc. complete , as per direction of E.I.C | 261.820 | cum |
| 2 | Providing filling manually with selected sand layers not exceeding 150 mm thick including watering and compacting with all leads and lifts etc. for finished items of works including all cost, conveyance, taxes, royalities with all labour and T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 191.240 | cum |
| 3 | Cement concrete in prop ( l:3:6 ) in foundation using 4cm size hard granite metal of approved quality and from the approved quarry including hoisting,lowering,laying, concrete in layers not exceeding 15cm thick with all cost,conveyance,taxes,royalities with all labour and T&P etc.complete as per direction of the Engineer-in-charge. | 95.910 | cum |
| 4 | C.C. ( 1:2:4 ) using 20mm down grade size crusher chips quarried & free from weathered skin of approved quality including hoisting, lowering, laying the concrete in position to proper slope and level compacting in layers and finishing the exposed surface (GF & FF) . | 11.370 | cum |
| 5 | RCC work M25 grade with 20mm and down grade black hard granite crusher brocken stone chips of approved quality and from the approved quarry including hoisting ,lowering, laying and compacting concrete to necessary slope and smoothness watering,curing centearing , shuttering with all cost, conveyance, taxes ,royalities with all labour and T&P etc.complete in all respect as per direction of the Engineer-in-charge.Column base & footing(Ground Floor) | 28.910 | cum |
12 Days Left