Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4053538 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Protection Wall Of Pmc Canal Between Ch. 85 Of Parbati Dam |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 19114.00 |
| Estimated Cost | 956000.00 |
| City | Dholpur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes,shrubsAnkra/Ipomoea,Juliflora typna etc. on canal and bunds in dry/moist/slushy conditionsincluding disposal as per instructions of the Engineer-in-charge. Costof wood has been deducted from rates and thus will be property ofcontractor after cutting.Thick | 830.00 | sqm |
| 2 | Excavation including loading, unloading, disposal and dressing ofexcavated earth within initial lead of 50m and lift up to 1.5m includingdressing of excavated area and dewatering wherever required complete in all respect (a) Soft/Loose soil | 124.50 | cum |
| 3 | Earth work in rough (borrow area) excavation for embankments in hardsoil, morrum or highly weathered strata dry or moist, including laying in20 cm layers (before compaction) and breaking of clods, sorting of grass,pebbles etc. and dressing when compacted by vibrocompactor, vibro sheepfoot roller, sheep foot roller/pneumatic tyred roller to obtain dry densityof at least 98% of Standard Proctor's density with initial lift of1.5m (Excluding charges for compaction and watering) including loadingand un-loading wherever required complete in all respect (a) With initial lead of 250 m 17(a) Deduct in itemno16(a) to (d)above if Standard Proctor's density to be achived is at least 95% | 269.75 | cum |
| 4 | Compaction of earth or highly weathered strata (b) By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctor's density | 269.75 | cum |
| 5 | Watering of earth including cost of carriage of water when source of water is(a) up to 1 Km | 269.75 | cum |
Ending Today