Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4382824 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Construction Of Pcc Perimeter Road On Southern Side Runway At Ins Kohassa. |
| Last Date For Submission | 26th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 425000.00 |
| Estimated Cost | 35000000.00 |
| City | Diglipur |
|---|---|
| State | Andaman and Nicobar Islands |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork excavation in all kinds of soil by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth, 1.50m in width as well as 10 sqm on plan) but n.exc 1.5m depth, including getting out and disposal of excavated earth lead upto 50m and lift upto 1.50m complete all as specified and directed. | 4648.72 | Cubic Metre |
| 2 | Earthwork excavation in all kinds of soil by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth, 1.50m in width as well as 10 sqm on plan) but n.exc 1.5m depth, including getting out and disposal of excavated earth lead upto 50m and lift upto 1.50m complete all as specified and directed. (work in slushy area) | 92.12 | Cubic Metre |
| 3 | Excavating in trenches, n exc. 1.5m wide and n exc 1.5m in depth, for foundation, etc., or for shafts, wells, cesspits, manholes, pier holes, etc., n exc 10 sqm on plan and n exc. 1.5 m in depth and getting out in water or liquid mud soil complete all as specified. (work in slushy area) Note for 2 & 3 : The rate shall include the cost of dewatering, addl. supports / formwork required for stabilizing the surrounding soil due to sliding etc., if any. | 57.75 | Cubic Metre |
| 4 | Earthwork excavation in trenches n.exc. 1.5m wide and n.exc.1.5m deep and getting out in soft / loose soil complete all as specified and directed. | 578.34 | Cubic Metre |
| 5 | Removing excavated soil to a distance exc. 50m and n.exc. 250m, depositing where directed at a level n exc. 1.5m above the starting point complete all as specified and directed. | 4759.74 | Cubic Metre |
7 Days Left