Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4083402 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Extension Of Apwd Division Office Building Under Maintenance Section Sd-i, Cd, Apwd, Diglipur. Sw- Supply, Installation, Testing and Commissioning Of 02 Nos. Air Conditioners In Apwd Division Office |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 4953.00 |
| Estimated Cost | 247639.00 |
| City | Diglipur |
|---|---|
| State | Andaman and Nicobar Islands |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Wiring for Light/ power plug wiring with 2 x 4 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed PVC conduit alongwith 1 No. 4 sq.mm FRLS PVC insulated copper conductor single core cable for loop earthing as required. | 20.00 | Mtr. |
| 2 | Supplying and fixing of 4 Module Modular AC Box 20 A DP MCB with Metal Enclosure & Plug Top (Make:Anchor,Item Code: 98492 or equivalent) including connection etc. as required. | 2.00 | Each |
| 3 | Supplying installation testing and commissioning of 5 KVA voltage stabilizer working range (I/P) (170 VAC-270 VAC) (Make: V Guard, Model: VG 500 or equivalent) including connection etc. as required. | 2.00 | Each |
| 4 | Supplying, installation, testing and commisioning of 2.0 Ton Capacity BEE 5 star rated, Inverter High wall Split Type Air Conditioner with copper condenser coil , single phase (Make: HITACHI TOUSHI PLUS 5200XL Inverter R32 , Model No: 2.0 Ton - RAS.E522PCBISH1 or equivalent) with suitable wall bracket, providing standard length of refrigerant copper pipe including cutting drilling holes on the wall for passing gas pipe, cementing, painting to give a smooth finish and wrapping PVC Non adhesive white tape over insulation of gas pipe etc. as required. | 2.00 | Each |
| 5 | Dismantling and Re-installation, testing and commissioning of following capacity split type Air Conditioner suitable for wall mounting i/c cutting/ drilling holes on the wall for passing gas pipes, fixing PVC pipe on the wall through the holes and cementing, painting to give an even look and smooth finish, wrapping PVC non adhesive tape over insulation of gas pipe etc including gas charging as required and as per the direction of Engineer-in-charge. |
Ending Today