Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4083402
Organisation NamePublic Works Department
Tender BriefCorrigendum : Extension Of Apwd Division Office Building Under Maintenance Section Sd-i, Cd, Apwd, Diglipur. Sw- Supply, Installation, Testing and Commissioning Of 02 Nos. Air Conditioners In Apwd Division Office
Last Date For Submission28th Apr, 2026
Opening Date28 Apr, 2026
Cost
Document Cost0.00
EMD4953.00
Estimated Cost247639.00
Location
CityDiglipur
StateAndaman and Nicobar Islands

Register to see full details

BOQ Items
#ItemQtyUnits
1Wiring for Light/ power plug wiring with 2 x 4 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed PVC conduit alongwith 1 No. 4 sq.mm FRLS PVC insulated copper conductor single core cable for loop earthing as required.20.00Mtr.
2Supplying and fixing of 4 Module Modular AC Box 20 A DP MCB with Metal Enclosure & Plug Top (Make:Anchor,Item Code: 98492 or equivalent) including connection etc. as required.2.00Each
3Supplying installation testing and commissioning of 5 KVA voltage stabilizer working range (I/P) (170 VAC-270 VAC) (Make: V Guard, Model: VG 500 or equivalent) including connection etc. as required.2.00Each
4Supplying, installation, testing and commisioning of 2.0 Ton Capacity BEE 5 star rated, Inverter High wall Split Type Air Conditioner with copper condenser coil , single phase (Make: HITACHI TOUSHI PLUS 5200XL Inverter R32 , Model No: 2.0 Ton - RAS.E522PCBISH1 or equivalent) with suitable wall bracket, providing standard length of refrigerant copper pipe including cutting drilling holes on the wall for passing gas pipe, cementing, painting to give a smooth finish and wrapping PVC Non adhesive white tape over insulation of gas pipe etc. as required.2.00Each
5Dismantling and Re-installation, testing and commissioning of following capacity split type Air Conditioner suitable for wall mounting i/c cutting/ drilling holes on the wall for passing gas pipes, fixing PVC pipe on the wall through the holes and cementing, painting to give an even look and smooth finish, wrapping PVC non adhesive tape over insulation of gas pipe etc including gas charging as required and as per the direction of Engineer-in-charge.
28th Apr, 2026

Ending Today

WhatsApp