Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4527607 |
|---|---|
| Organisation Name | Nagaland Urban Infrastructure Development Project |
| Tender Brief | Corrigendum : Improvement Of Roads, Roadside Drains In Dimapur |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 29500.00 |
|---|---|
| EMD | 7000000.00 |
| Estimated Cost | 0.00 |
| City | Dimapur |
|---|---|
| State | Nagaland |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | By Mix in Place Method - Construction of granular sub-base by providing granular material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Granural Sub-Base Grading-I Material | 14,834 | Cum |
| 2 | Wet Mix Macadam - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in Mechanical Mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density Laying Using Mechanical Paver | 17,660 | Cum |
| 3 | Surface Course (Bituminous) Prime Coat over WMM Providing and applying Primer coat with Cutback MC 30 bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60kg/ sqm using mechanical means. | 75,400 | Sqm |
| 4 | Tack Coat on WMM Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 75,400 | Sqm |
| 5 | Dense Graded Bituminous Macadam Gr-I - Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder@ 4.0% by weight of total mix and filler, transporting the hot mix to worksite, laying with a paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,703 | Cum |
6 Days Left