Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3755564 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Maint Of Roads Of Zone I Under Age Br I At Dinjan Mil Stn Under Ge Dinjan |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 95000.00 |
| Estimated Cost | 4750000.00 |
| City | Dinjan |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for repair to potholes any depth, not exc 1 sq m each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by filling in screened & graded road metal, watering and well ramming (including supply of road metal) complete all as specified and directed.complete all as specified and as directed. | 5.00 | 10Sqm |
| 2 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces exc 50mm and n exc 100 mm deep and area not exc 400 sqm complete all as specified and as directed. | 100.00 | 10Sqm |
| 3 | M&L for 7.5 cm thick (compacted thickness) WBM, with coarse aggregates of grading 2 (63 to 40mm size) with lime stone, sand stone, flint or quartzite, spread, rolled and consolidated to gradient and camber required with 8 to 10 ton power roller, complete all as specified and as directed. | 10.00 | 10Sqm |
| 4 | M&L for Premix bituminous macadam (consolidated thickness exc. 50 mm & n.ecx 75 mm) with 4 % binder content by weight of total mix using bitumen VG-30 laid, rolled and compacted to required gradient and camber with 8 to 10 tonne capacity power roller by using hot mix plant & mechanical paver complete all as specified and as directed. | 45.00 | Cum |
| 5 | M&L for preparing of unsurfaced water Bound macadam/bituminous macadam by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a priming / tack coat using paving bituminous primer VG-10 at 7.5 kg per 10 Sqm. | 100.00 | 10 Sqm |
6 Days Left