Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5027785 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Construction Of Collection Tank At Aekhan Block Ghat Panchayat Sharerna And Tapping Of Additional Source From Barassu Spring To 5000 Gallons Old Gsr Under District Capex Budget 2026-27 (jkssr 2022) |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 7600.00 |
| Estimated Cost | 378000.00 |
| City | Doda |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by Engineer incharge in all kind of soil. | 128.89 | Cum |
| 2 | Earth work in excavation by manual means over areas (exceeding 30cm and upto 1.5mtr in width as well as 10 Sqm on plan) including disposal of excavated earth upto 1mtr. for cutting edge, disposed earth to be levelled & neately dressed in all kind of soil. | 16.54 | Cum |
| 3 | Providing & laying in position cement concrete of specified grade excluding the cost of centring & shuttering all work upto plinth level in 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggr. 40mm nominal size. | 1.35 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement All works upto plinth level 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1.09 | Cum |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 3.14 | Cum |
6 Days Left