Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4900801
Organisation NamePublic Works Department
Tender BriefCorrigendum : Macadamization Of Lower Kuchal To Upper Kuchal Link Road Km 1st And Km 2nd Rd (500) (under Cities And Towns (c And T) Sector Capex Budget 2026-27). (3rd Time).
Last Date For Submission23rd Jul, 2026
Opening Date24 Jul, 2026
Cost
Document Cost1500.00
EMD160000.00
Estimated Cost8000000.00
Location
CityDoda
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : 447.00cum
2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock50.90cum
3Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) with Nallah Stone.187.23cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)413.30cum
5Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (Labour Rate) with stone made available from removing individual boulders.253.03cum
23rd Jul, 2026

4 Days Left

WhatsApp