Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation And Flood Control Department
Tender ID4034345
Organisation NameIrrigation And Flood Control Department
Tender BriefStage Tenders For The Year 2026-27 E-nit No.05 Of 04/2026 Dated 17-04-2026
Last Date For Submission23rd Apr, 2026
Opening Date24 Apr, 2026
Cost
Document Cost1000.00
EMD40000.00
Estimated Cost0.00
Location
CityDoda
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1. 5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) All kinds of soil.1.00cum
2Earthwork in excavation by mechanical hydraulic excavator means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1.5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) All kinds of soil. 1.00cum
3Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1. 5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) Hard rock (blasting prohibited)1.00cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)1.00Cum
5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)1.00Cum
23rd Apr, 2026

5 Days Left

WhatsApp