Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4448037 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of Pcc Road At Babudih From House Of Tayab Ansari To Bhatgadih Bandh Village Babudih, Post-chilra Block Saraiyahat. |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2460793.00 |
| City | Dumka |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 167.75 | cu.m |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 50.33 | cu.m |
| 3 | Providing designation 75B one brick on edge soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 671.00 | sq.m |
| 4 | Construction of un-reinforced, dowel jointed plain cement concrete pavement over a prepared sub base with approve grade cement @400 kg per cum coarse and fine aggregate confirming to IS 383, maximum size of coarse aggregate not exceeding 25 mm mixed design ................do...............do............... all Complete E/I. | 237.90 | cu.m |
| 5 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 39.60 | cu.m |
5 Days Left