Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4549220 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Construction Of Health Sub Centre Dukhyadih Under Block Raneshwar In Dumka District. |
| Last Date For Submission | 27th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 111000.00 |
| Estimated Cost | 5549856.00 |
| City | Dumka |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 38.910 | cu.m |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 38.910 | cu.m |
| 3 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 20.146 | cu.m |
| 4 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering texes royalty all complete as per building specification and direction of E/I. | 144.784 | sq.m |
| 5 | Providing P.C.C M-150 in foundation with nominal mix of (1:2:4) approved quality of stone metal 50mm to 40mm size graded and local river saProviding P.C.C M-150 in foundation with nominal mix of (1:2:4) approved quality of stone metal 50mm to 40mm size graded and local river sand (washed and screened) including screening, shuttering, mixing, cemetn concrete in mixer and placing in position vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of E/I. | 10.387 | cu.m |
3 Days Left