Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Indo Tibetan Border Police
Tender ID3991224
Organisation NameIndo Tibetan Border Police
Tender BriefConstruction Of Various Infrastructures At Bop Of 11 Bn Itbp Situated In Distt. Mangan, North Sikkim At An Altitude Of 14731 Feet And A Distance Of Approx 64 Km From Chungthang And 164 Km From Gangtok. Camp Connected By Road.situated In Distt. Mangan
Last Date For Submission4th May, 2026
Opening Date05 May, 2026
Cost
Document Cost0.00
EMD1964090.00
Estimated Cost98204510.00
Location
CityEast Sikkim
StateSikkim

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge.2925.00sqmtr
2Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil1119.60Cum
3Earth work in excavation by mechanical means (Hydraulic excavator)/manual mean foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.478.93Cum
4Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms,lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock478.93Cum
5Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m,533.66Cum