Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Indo Tibetan Border Police
Tender ID4568493
Organisation NameIndo Tibetan Border Police
Tender BriefCorrigendum : Const And Re-development Of Infrastructure (recreation Hall, Trainingshed And Mtshed I/c Boundary Wall An Supply, Installation, Testing and Commissioning Of Led Street Lighting) At Camp Of 13 Bn Itbp At An Altitude Of 15839ft And A Distance Of Approx. 200 Km From Mangan. Camp Road Connected.
Last Date For Submission15th Jul, 2026
Opening Date16 Jul, 2026
Cost
Document Cost0.00
EMD713283.00
Estimated Cost35664141.00
Location
CityEast Sikkim
StateSikkim

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil24.86cum
2Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil432.72cum
3Earth work in excavation by mechanical means (Hydraulic excavator)/manual mean foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.434.13Cum
4Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock434.13cum
5Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m,1223.67cum
15th Jul, 2026

6 Days Left

WhatsApp