Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4013579 |
|---|---|
| Organisation Name | State Building Construction Corporation Limited |
| Tender Brief | Corrigendum : Construction Of 100 Bedded New Hostel Building At East Singhbhum |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 469000.00 |
| Estimated Cost | 0.00 |
| City | East Singhbhum |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, levelling , ramming the foundation trenches, removing roots of trees, serbs all complete as per approved design,building specification & direction of E/I. | 616.395 | m3 |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/l (vide classification of soil item-B) | 451.010 | CUM |
| 3 | ExcavationinOrdinaryRockwith Dozer with lead upto100metres(Excavation for roadway inordinary rock by deploying a dozer,80HP including cutting and pushing the cut earth to site of embankment up to a distance of 100 metres (averagelead50metres) ,trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) | 140.941 | CUM |
| 4 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 135.000 | CUM |
| 5 | Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) | 120.351 | CUM |
4 Days Left