Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4767090 |
|---|---|
| Organisation Name | Urban Development Department |
| Tender Brief | Corrigendum : Construction Of Park In Kenddih, Kapali Nagar Parishad, Kapali Seraikela-kharsawan, Jharkhand |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 25 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 265000.00 |
| Estimated Cost | 13245243.00 |
| City | East Singhbhum |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design and per building specification and direction of E/I. | 651.19 | M3 |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 321.94 | M3 |
| 3 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 317.02 | M3 |
| 4 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 3840.00 | M3 |
| 5 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 37.52 | M3 |
3 Days Left