Tender ID4446287
Organisation NameInland Waterways Authority Of India
Tender BriefConstruction Of Pile And Slab Bank Protection In Various Vulnerable Locations Of Champakkara Canal In Nw-3
Last Date For Submission15th Jun, 2026
Opening Date16 Jun, 2026
Cost
Document Cost5900.00
EMD248951.00
Estimated Cost12447536.00
Location
CityErnakulam
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Site clearance by cutting and removing the grass, bushes, all obstructions etc., from the top surface and disposal of the same as and when directed by the Engineer.700.00M
2Removal of old P & S bank protection and existing paver block laid footpath and existing drainages, kadavu etc., including stacking of reusable materials like garden chairs, lam posts etc. within 500 m to the proposed site and disposal of unserviceable materials away from the site, without throw into canal as per directions of E - I -C. The rate shall include cost of hiring of machineries and plants, transportation of serviceable materials like pile, slab, anchor rod (if any) and labour charges etc. complete.200.00M
3Earth work in cutting river bank in all types of soil in required profile and removing the roots, grass and shrubs and disposal of the excavated material at suitable places as directed by Engineer, including all lifts and leads.1920.00M
4Earth work in filling in required profile in selected soil obtained from the approved borrow pit or any other source, free from logs, stumps, roots rubbish, etc. and placing the earth in layers not exceeding 225mm in thickness levelling dressing watering, ramming and consolidating by approved means to the required profile under the direction of the Engineer, including all leads & lifts etc., complete.1975.50M
5Supply and making of concrete square piles of approved quality of size 300mm x 300mm of required length including all fittings and fixtures etc. as shown in drawing for driving at site, etc. all complete as per approved designed and direction of Engineer except cost of reinforcement & form work.81.80M
15th Jun, 2026