| 1 | Civil works | | |
| 2 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in all kinds of soil in required depth including shoring, strutting, dewatering dressing of sides and ramming of bottoms, backfilling with useable earth and disposal of unsuitable earth , compaction using mechanical equipment, disposal if any inside ISRF site premises, by suitable means, all equipments, labour, all incidental expenses etc. all complete as directed by Engineer-in-charge. | 90 | m3 |
| 3 | Providing and filling with suitable borrow material as per specifications including supply and transportation, placing in position at all levels and creating suitable bunds, levelling the surface at water-logged areas or wherever directed by engineer-in-charge, including supply, lifting, loading, transporting, unloading, breaking of clods, watering, compacting each filled up layer, by flooding/ ramming/ plate compactor or any other mechanical means, including all materials, labour, equipments, other incidental expenses, etc. all complete as directed by Engineer-in-charge. (The quoted rate shall be inclusive of Royalty if applicable) | 78 | m3 |
| 4 | Providing and laying in position Plain cement concrete, in 1:2:4 Nominal mix with 20 mm down graded coarse aggregate in binding layer / fill under footings,floorings, screed, damp proof course etc. in level and line, including dewatering, ramming, levelling, curing, shuttering, de-shuttering etc. including all materials, labour, equipments, incidental expenses etc, complete as per approved drawings & specifications at all levels and as directed by Engineer-in-charge. | 28 | m3 |
| 5 | Providing and casting Reinforced Cement Concrete 1:1.5:3 grade for strip footing ,columns, beams, lintels, chajjas, slab, chamber etc. at all levels ,including shuttering, de-shuttering compacting with mechanical vibrators, hacking, curing,scaffolding, all equipments, labour, incidental expenses etc complete and as directed by Engineer-in-charge. (Reinforcement shall be measured and paid separately under relevant item). | 38 | m3 |