Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4400483 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Re Tender-lac-ads-2025-26 - Mulanthuruthy Block Panchayath - Amballoor Manthuruthel Palli Road Culvert-re Construction -general Civil Work |
| Last Date For Submission | 2nd Jun, 2026 |
| Opening Date | 02 Jun, 2026 |
| Document Cost | 2760.00 |
|---|---|
| EMD | 31763.00 |
| Estimated Cost | 1270501.00 |
| City | Ernakulam |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Culvert- Re Construction | ||
| 2 | 2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(B) Rubble Stone Masonry in Cement Mortar | 12.960 | cum |
| 3 | 2.5.2.B:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (II) By Mechanical Means (B) Reinforced Cement Concrete | 5.796 | cum |
| 4 | OD212935/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 63.000 | hour |
| 5 | OD212936/2025-2026:RING BUND Type II Putting up ring bund with earth filled gunny bags of top width 1.0 m bottom width 2.0 m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 12.500 | metre |
Ending Today