Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Cochin Shipyard Limited
Tender ID4858777
Organisation NameCochin Shipyard Limited
Tender BriefThe Construction Work Includes Underground Rcc Chamber Grade Slab With Ms Plate Strips In Perfect Line And Levels For Fixing The Machineries
Last Date For Submission23rd Jul, 2026
Opening Date24 Jul, 2026
Cost
Document Cost0.00
EMD301652.00
Estimated Cost15082591.00
Location
CityErnakulam
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Demolishing brick/ block/ stone rubble masonry without damaging nearby structure/facility/utilities/cable/duct, stacking of servicebale material at the designated location inside yard, fragmenting unserviceable materials into pieces smaller than 15 cm and disposal of material at designated CSL area, Samudrika, Cheriyakadavanthara (approx 2 km outside of the yard) and leveling of the same at the location as per direction of Engineer-in -charge.5.00m3
2Demolishing of all types of concrete work in required width, line and depth, without damaging nearby structure/facility/utilities/cable/duct, fragmenting demolished materials into pieces smaller than 15 cm and disposal of material at designated CSL area, Samudrika, , Cheriyakadavanthara (approx 2 km outside of the yard) and levelling of the same at the location as per direction of Engineer-in -charge.15.00m3
3Shifting and stacking of concrete slabs of nominal size 700 mm 1,200 mm 100 mm thick (or equivalent dimensions as available at site), from the existing location (currently laid on the floor) to the designated storage/stacking area within 1 km inside CSL yard, including lifting, handling, loading, transportation, unloading, and stacking complete, ensuring no damage, cracking, chipping, or breakage during the entire operation. The rate shall include all labour, tools, tackles, equipment, machinery, transportation, and incidental works necessary for completing the shifting operation, all as directed by the Engineer-in-Charge.140.00Nos
4Earthwork excavation in all classes of soils including necessary bailing out of water, dressing of sides and bottom, shifting of excavated earth within 100m for storage and disposal, clearing of any roots or vegitation, without damaging any near by structures/utilities etc complete including all labour,material,machinery charges etc as directed by the Engineer-in-Charge. (Shoring & carriage if necessary shall be measured under relevant item)
5Lift upto 1.5m840.00m3
23rd Jul, 2026

16 Days Left