| Tender ID | 4655828 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Corrigendum : 142. Construction Of A Park Near The House Of Sunil Yadav Bhure In Chauhan Colony. |
| Last Date For Submission | 10th Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 2478.00 |
|---|---|
| EMD | 180300.00 |
| Estimated Cost | 1803000.00 |
| City | Etawah |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil (loam, clay or sand) including lift up to 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (S.I No. 251)For wall,Gate, Column, Less Column | 39.50 | m3 |
| 2 | Earth work in embankment mechanically compacted to 95% proctor density in ordinary soil excavation to be done in form of regular pits not exceeding M in depth and earth work to be done in 20 cm. layers including ramming and dressing pulvarization the surface to required leves and slopes and also including 1.5M lift and 30 M lead. The earth from cutting to be used in making embankemnt or to be deposited as spoil banks within 30 M distance as directed by the Engineer incharge including supply of roller and water required for proper completion of work as per MOST specification No. 301.2.1 Including roytalty with 8Km Carted. | 110.59 | m3 |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 400-2.. Gate, Column, Less | 44.26 | m3 |
| 4 | Class-150 brick in 1:3 Cement and coarse sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (S.I. No. 307), For Wall, Gate(Upto GL), Less | 20.77 | m3 |
| 5 | Class-150 brick in 1:3 Cement and coarse sand in Super structure all materials, labour and tools and plants, etc. required for proper completion of the work.(S.I. No. 307+310), Above GL, Less Gate Column, Gate1, Gate2, Column | 20.05 | m3 |