Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4442280
Organisation NameIrrigation Department
Tender BriefRepair Of Inlet At Km 34.100 Of Etawah Stump.
Last Date For Submission4th Jun, 2026
Opening Date04 Jun, 2026
Cost
Document Cost856.00
EMD62000.00
Estimated Cost0.00
Location
CityEtawah
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in foundation and in canal in dry ordinary soilincluding lift upto 1.5m and lead upto 30m including backfilling watering and ramming of excavated earth in to the structure and sides of foundation trenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure.53.00cum
2Providing concrete for plain concrete M 15 grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.13.58cum
3Providing concrete for Reinforced cement concrete M20 grade in foundations including cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST22.55cum
4Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc101.92sqm
5Supplying,cutting binding and placing HYSD bar reinforcement in structure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST.1.07MT
4th Jun, 2026

4 Days Left

WhatsApp