Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3998933 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Quotation Annual Plan-ebp 232/26-parippu Division - Construction Of Motor Shed At Vkv Paddy Field Kollathukari Of Ward 1 Of Aymanam Gp-general Civil Work |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 21186.00 |
| Estimated Cost | 847446.00 |
| City | Ettumanoor |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PARAKUZHY | ||
| 2 | OD457288/2025-2026:Putting up earthern bund having a top width of 1.00m,bottom width of 2.00m and height 2.50m using 1/2 split coconut post 4 rows;driving down 60cm centre to centre and 1.50m below GL tying with coir yarn and 1/2 split coconut horizontal piece 4 rows on both sides,cross ties 1.00m apart and struts on both sides at 2.00m apart and screening with 1/3 split arrecanut reepers 30 cm square mesh and with double new coconut cadjan and all tying properly with GI fencing wire and filling inside with stiff clay of approved quality as water proof layer etc.complete | 12.000 | 1 meter |
| 3 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 20.855 | cum |
| 4 | OD457287/2025-2026:Bailaing out water using pump above 5HP bailing out water with engine and pump set above5HP and up tk 10HP including conveyance to site and erection cost of fuel lubrication and stores pay to staff etc complete | 48.000 | hour |
| 5 | OD457289/2025-2026: Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. (modified item 60.64.1) | 288.000 | metre |
8 Days Left