Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Faridabad Metropolitan Development Authority
Tender ID4265450
Organisation NameFaridabad Metropolitan Development Authority
Tender BriefCorrigendum : Desilting And Cleaning Of Master Sewer Lines, And Rehabilitation Of Damage Sewer Line With Cipp Structural Lining Method Related To Mps Partapgarh And All Other Work Contingent Thereto.
Last Date For Submission21st May, 2026
Opening Date22 May, 2026
Cost
Document Cost1180.00
EMD604060.00
Estimated Cost30203100.00
Location
CityFaridabad
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing CCTV survey by Pan Tilt Camera with Zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of Engineer-in-Charge.$1700.000Metre
2NS Item- Desilting and chocked master sewer lines, removing of blockage and desilting of blocked master sewer line with high pressure jetting and high volume super-sucker machine, opening of blocked sewer line, manholes disposal of retained silt to hazard free dumping ground. The work shall include mobilization of equipment cost of sundries and safety devices, dewatering, cleaning and required plugging of manhole including cartage, loading and unloading of silt/ sludge from the site, insurance of employee and labours and all over head charges etc. complete as per directions and to the entire satisfaction of the engineer-in-charge. 1400 mm diameter $600.000Metre
31800 mm diameter Desilting and chocked master sewer lines, removing of blockage and desilting of blocked master sewer line with high pressure jetting and high volume super-sucker machine, opening of blocked sewer line, manholes disposal of retained silt to hazard free dumping ground. The work shall include mobilization of equipment cost of sundries and safety devices, dewatering, cleaning and required plugging of manhole including cartage, loading and unloading of silt/ sludge from the site, insurance of employee and labours and all over head charges etc. complete as per directions and to the entire satisfaction of the engineer-in-charge.$1100.000Metre
21st May, 2026

Ending Today

WhatsApp