Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3671411 |
|---|---|
| Organisation Name | Faridabad Metropolitan Development Authority |
| Tender Brief | Corrigendum : Master Drainage Scheme Faridabad-repair, Restoration Of Damaged Crossings And Desilting Of Existing Drains Along Master Roads Falling In Zone -ii And Zone-iv Of Master Storm Water Drainage Plan (falling In Badkhal Constituency And Part Area Of Nit |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 681520.00 |
| Estimated Cost | 34070621.00 |
| City | Faridabad |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Hiring and operation charge of suction tanker for bailing out rain water from various water logging point including cost of fuel, driver and helper etc. complete in all respect. | $500.000 | Nos. |
| 2 | Hiring and operation charges of Tractor mounted pump including diesel, operator, Helper and other TandP Complete as per site requirement.... | $36.000 | Per Month |
| 3 | Cleaning and desilting of existing surface drains of average size 1.00 m x 1.00 m or as existing at site including removal of sludge/silt/garbage manually or mechanically as required and loading, unloading and stacking the same and transported by mechanical means to a disposal site identified by the contractor free from any litigation and approved by Engineer-in-Charge including all lifts, leads, tools and plants, labour, fuel, carriage, and other incidental charges complete as directed by the Engineer-in-Charge. | $1.000 | Job |
| 4 | Operation and Maintenance of Drains including 15 no. Labour, JCB, Tractor trolly for resolving complain regarding storm water drainage complaints complete in al respect. (Area of Badkhal, NIT-86 and Ballabgarh Constituency Approx. 35KM Length) complete job for 01 month. | $3.000 | Per Month |
| 5 | Cleaning and desilting of existing surface drains of average size 1.00 m x 1.00 m or as existing at site, including removal of sludge/silt/garbage manually or mechanically as required and loading, unloading and stacking the same and transported by mechanical means to a disposal site identified by the contractor free from any litigation and approved by Engineer-in-Charge including all lifts, leads, tools and plants, labour, fuel, carriage, and other incidental charges complete as directed by the Engineer-in-Charge. | $880.000 | Per Metre |
4 Days Left