Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4369350
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Periodical Services, Repair/replacement To Doors, Windows, Ventilators, Cupboards And Other Miscellaneous Joinery Works At Af Stn Dadri Under Aor Of Ge (af) Faridabad
Last Date For Submission11th Jun, 2026
Opening Date13 Jun, 2026
Cost
Document Cost500.00
EMD90000.00
Estimated Cost4500000.00
Location
CityFaridabad
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1NOTE FOR ALL PAINITNG AND WATER PROOFING ITEMS :- The following precautionary measures shall be ensured by the contractor before and during execution of the work : (i) All the painting works shall be got executed through original material manufacturing company or their authorised applicators as approved by GE and contractor should submit MOU with the manufacturing company and their authorised applicator alongwith performence guarentee..Entire work shall be executed with the approved firm. All the material of smart periodical is to be precured only from approved firm and as mentioned against each item and application of materials to wall / ceiling surfaces to be done through smart automatic machines only and as mentioned against item No 2 to 7. (ii) Contractor shall deposit entire quantity of materials (proprietory materials) in sealed containers required for painting works covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (iii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (iv) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses and joinery. (v) Recovary @ cost of material shall be done from contractor if any material found lying on site after completion of work as per manufacturer's instruction and quality satisfaction of Engineer-In-Charge. (vi) The work shall be executed upto 10 mtr height and cost of suitable scaffolding shall be deemed to be included in quoted rates by the tenderer. (vii) Smart periodical work to be executed in sequential stages and all the stages to be got approved from GE / Engineer-In-Charge. Stage passing register duly signed to be kept in record. (viii ) The work will be carried out in following steps as appended below :-
2M&L for complete removal of old existing treatment of walls (External/internal) finishes using mechanical dry wall sander machine (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 320 Grit or above to completely remove old existing treatment for wall and ceiling surface and ready to take new surface finishes complete as specified and as directed.3500.00Sqm
3M&L for applying waterproof cement based putty @ 0.5 Kg (undiluted) per sq mtr. of average thickness 1.5mm in two coats on prepared wall (External/internal) surfaces as per item No 2 above in following steps:- Step-1) Filling cracks in wall using crack seal compound Asian smart care crack seal or equivalent. Step 2) Mix the putty powder @ 0.5 kg/sqm by adding 35 to 40% water by volume or as per approved manufacturer's instructions and mix it with electric putty mixer with the mixing capacity of min 2.5 kg putty per minute upto 5 to 10 minutes. Step 3) Apply the first coat of the prepared mix with the help of fully automatic airless spray machine TruCare Graco Ultramax II 490 PC Pro or equivalent of putty application having flow speed of max 2.04 ltrs per minutes with a maximum pressure 3300 PSI with bottom to top configuration. Step 4) Allow 6-8 hrs to dry putty surface. Step-5) Apply the second coat of the prepared mix with the help of fully automatic airless spray machine TruCare Graco Ultramax II 490 PC Pro or equivalent of putty application having flow speed of max 2.04 ltrs per minutes with a maximum pressure 3300 PSI with horizontal configuration. Step-6) Allow 6-8 hrs to dry putty surface then prepare the surface by electronic wall sander machine to apply subsequent coats of primer. Note : Primer shall be measured and paid saperately under relevant item. 3500.00Sqm
4M&L for applying one coat of acrylic water based interior grade primer @ 0.7 ltr (undiluted)/10 Sqm diluted with water in 1:1 ratio (Minimum) or as per approved manufacturer's instructions to be applied with fully automatic airless spray machine TruCare Graco Ultramax II 490 PC Pro or equivalent of paint application with a flow speed of min 2.0 ltr per minute having a pressure of 3300 PSI on prepared and wall (External) surfaces as per item No 2 & 3 above Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. Make :- Asian royale wall base coat primer, Nerolac premium primer, berger BP white primer complete all as specified and as directed.500.00Sqm
5M&L for applying with fully automatic airless spray machine TruCare Graco Ultramax II 490 PC Pro or equivalent of paint application with a flow speed of min 2.04 ltr per minute having a pressure of 3300 PSI of paint application with a flow speed of 2 ltr per minute having pressure of 3300 PSI two coats of high-sheen, anti- fungle, anti bacterial, low-VOC & highly washable luxury emulsion paint with @ 0.8 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio (Minimum) or as per manufacturer's instruction taflon surface protector of shade as approved complete all as specified and as directed .500.00Sqm
11th Jun, 2026

6 Days Left

WhatsApp