Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Directorate Of Urban Local Bodies
Tender ID4461104
Organisation NameDirectorate Of Urban Local Bodies
Tender BriefSupply And Laying Of Storm Water Line And Construction Of Disposal Tank In Community Center Near Shahid Park Boosting Ward No. 05, Nit Faridabad
Last Date For Submission17th Jun, 2026
Opening Date18 Jun, 2026
Cost
Document Cost5000.00
EMD128460.00
Estimated Cost6423117.00
Location
CityFaridabad
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing and fixing of generating set of 360 KVA including Its connection temporary for operating pumping setsat site etc. complete in all respect$70.000Each
2Plugging and de-plugging of 1600 mm dia incoming sewer lines to be connected with last Manhole prior to MPS and re-plugging the same after furnishing the entire work complete in all respects to the entire satisfaction of the Engineer in charge. $40.000Each
3Construction of Pumping Stations as per the scope, specifications and drawings of DNIT, consisting of: i. RCC Receiving Chamber ii. Sluice Gates iii. Screening Chamber with RCC staircase. iv. Mechanical Screens v. Wet Well with compartment. vi. Pumping Sets with Delivery pipe vii. Rising main viii. Lifting Arrangement (includes column, Girder, Chain pully Block etc.) ix. Pipe Gallery for housing common header pipe, sluice valves, NRV, and dismantling joint, including specials. x. Transformer with foundation. xi. Diesel Generating Set with platform and shed. xii. Panel Room with office and toilet facilities. xiii. Electric Control Panel Board xiv. Electric cabling, including connecting to Existing Substations, if any. xv. Automation. xvi. Metering room xvii. Street Lighting. xviii. Internal Roads with drainage. xix. External sewerage. xx. Furniture xxi. Storage Room xxii. Boundary Wall etc. xxiii. Any other item required for the completion and satisfactory working of Pumping Stations. Sewage Pumping Station 90 MLD Peak Flow$1315.500Kg.
4Dewatering of leaked sewage water during the construction of a new manhole from the second last manhole.$40.000Each
5Operation and maintenance cost for entire sewer line system created under the contract which includes Basic Service Charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, fuel, water and all other matters and items of whatsoever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work and terms and conditions of contract etc. complete For Fifth Year$1315.500Kg.
17th Jun, 2026

15 Days Left