Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4461421 |
|---|---|
| Organisation Name | Border Security Force |
| Tender Brief | Renovation/up Gradation Of Type Ii/24 (01 To 24) Nos Qtrs At Bsf Campus Arty Hq Faridkot (2nd Call) |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 214881.00 |
| Estimated Cost | 10744046.00 |
| City | Faridkot |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 19.25 | cum |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km, also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc., complete. | 67.71 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) | 33.55 | cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.00 | cum |
| 5 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 225.84 | sqm |
13 Days Left