| Tender Brief | Corrigendum : Supply Of Places , Replacing Wornout Runner Base And Installing A New Runner Base Of Cane Carrier And Baggage Elevator And R B C , Replacing Wornout Runner With New One Of Cane Carrier And Baggage Elevator And R B C , Removing Wornout Angle Iron And T Iron Of The Cane Carrier And Reinstalling It By Straightening The Crooked Part , Removing The Wornout Part Of The Suit From Different Places And Fitting It With New One , Chevron Grooving Of New Rollers Of The Mill , Chevron Grooving Of Old Rollers Of The Mill , Remove The Wornout Partition Plates Of The Juice Box Above And Below The Juice Heater By 10 Or 12 Mm Ms Plate And Install It , Installing Ribs At The Top And Bottom Partitions Of The Juice Heater , Repairing Save All Of Qurdbody , Removing Old Wornout Gutters Installed At Various Places And Installing It With New Gutters , Remove The Old Wornout Save All From Pan And Quard And Install It With New One , Reinstalling The New Umbrella Fitted Inside The Pan By Making A New One And Removing The Old One , Replacement Ribbon Arm Of The Mascute Receiving Crystallizer , Making New Separator Of A Centrifugal Machine , Removing The Wornout Truff Of The Hopper And Installing It With New One , Making And Installing New Separators For Continuous Centrifugal Machines , Removing The Tubes Of Quad Juice Heater And Dynamic Juice Heater And Expanding Them By Installing New Tubes And Giving Their Hydraulic Testing Satisfactory Of Size 42 Mm , Removing The Tubes Of Pan Installing New Tubes And Expanding Them And Giving Hydraulic Tesing With Satisfactory Trial Of Size 96 Mm , Removing The Wornout Flue Gas Ducting Of Both The Boilers And Installing It With Newone Making From New Or Old Plates , Removing The Wornout Front And Roof Plate At Boiler Number 1 And 2 And Installing With A New Plate , Removing The Damaged Boiler Damper And Installing A New One , Making Bagasse Suit And Installing. , Replacement Of Juice Over Flow Box Of Clarifier , Making And Installing Bed Of Motor And Pumps At Various Places As Per Requirement , Replacement 6 Inch Dia Cooling Pipe Of Sulfur Furnace , Removing The Monitor Casing Of A Machine From Old Machine And Installing It And Giving Its A Trial , Making Amd Replacing Manholes At Various Places , Making And Replacing The Enternals Of Cather Of The Pan. , Making And Replacing The New Hood Of Cane Cutter , Removing The Old Bottom Plate Of The Lowest Compartment Of The Clarifier And Placing A New Plate On It After Placing An Angle Trap As Per The Instructions And Giving A Satisfactory Water Trial , Reinstalling The Stirrer Of The Clarifier And Giving A Satisfactory Trial , Removing The Shaft Of A Pug Mill And Replacing The Old Bushes On Both Sides And Fitting New Ones , Removing And Refitting The Shaft Of A Brown Sugar Magma Mixer And Installing With New Bush , Reinstalling The Trufff Of Connecting Rod Of The Hopper , Making And Installing New Catcher Strainer , Removing The Old Rail Line Of The Trolley Of The Unloader And Fitting The New Rail Line Satisfactorily And Doing Water Level , Reinstalling The Old Rail Line Of The Unloader S Bridge And Fitting It And Checking Water Level Etc , Removal Of Old And Weak Channels Of 3 Inches To 10 Inches Diameter Installed At Various Places And Installation Of New Ones As Per Requirement , Cutting And Straightening Old Plates Installed At Various Places As Per Requirement , Removal Of Old And Wornout Scrubber Installed On Sulfur Furnace And Making And Replacing With 8 Or 10 Mm Plate And Making All The Connections , Removing The Trufff Plate Including Support Corroded Shell And Top Cover Plate Of The Top Chamber Of The Clarifier And Fitting The New Plate And Giving It S A Water Proof Trial , Re-installation Alignment And //bid Details 2 / 47 Trial Of Hopper Driving End , Making And Installing The Top Cover Of The Centrifugal Machine , Making An Arm And Installing It On The Shaft Of Pug Mill , Making And Installing Scrubber And Bottle Jackets Of Sulfur Furnace , Making And Installing Drum Type Sulfur Furnace , Cutting Out The Corroded Save All And Making And Fitting It With A New Plate , Modify The Juice Sulfiter By Reducing The Cell Diameter As Per The Drawing , Removing The Screen Of Old Dsm And Fitting A New One And Replacing Its Wornout Frame , Removing The Wornout Mixed Juice Spreader Installed In The Mill And Installing A New One As Per The Instructions , Cleaning All The Tubes Of The Transient Heater And Giving Hydraulic Testing , Replacement And Straighthening Of Wornout Plate Of Unloader Trolley , Cutting Out The Corroded Juice Tray Of Mill And Installing A New One And Giving Satisfactory Trial , Installing Guides On Both Sides Of The Chain Near The Cutter In The Cane Carrier , Making And Replacing Of Wornout Suit With New One Of Cane Carrier , Dismantling The Wornout Catcher Of The Quad S Fourth Body And Making And Installing Its With New 8 Mm Plate , Removing Old And Damaged Gear Of Vacuum Crystallizer And Installing New Gear Doing Alignment And Giving Satisfactory Trial , Making And Installing The Oil Tray Of Mill House With New One. , Making New Frame Of Inter Carrier Using 8 Mm Plate And Angle And Channel , Straightening Of Wornout Columns Of Cane Carrier And Bagasse Carrier Approx 2 Fit Hight |