Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4032349 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | New Construction Work From Bhuvanpur To Ramkishores Field |
| Last Date For Submission | 12th May, 2026 |
| Opening Date | 13 May, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 78000.00 |
| Estimated Cost | 3898000.00 |
| City | Farrukhabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 580 | Sqm |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Clause 300 11.1 | 30.12 | Cum |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (301.5+302 ii) | 2170 | Cum |
| 4 | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements.Clause 301.5 (3.3+3.5) (301.5+302 ii) | 313.2 | Cum |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 244.04 | Cum |