Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4370803 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair To Certain Roads Under Ge Ludhiana |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 30 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 107000.00 |
| Estimated Cost | 0.00 |
| City | FEROZEPUR |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying or picking existing gravelled macadam or bituminous macadam surface, area not exceeding 400 Sqm and depth exceeding 50mm and not exceeding 100mm (average 75mm) and segregating serviceable stone metal for re-using and removal of debris from site to a distance upto 50 metres spread & leveled complete all as specified and directed. | 603.00 | Ten Sqm |
| 2 | M&L for preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc. Sweeping with brooms and finally fanning the cleaned surface with Air Compressor to remove all loose dirt etc complete all as specified and directed. | 783.00 | Ten Sqm |
| 3 | M&L for applying evenly a priming/tack coat over existing black top surfaces with bituminous primer at 5 Kg per 10 Sqm using VG-10 bitumen of road surface by sprayer operated by hot pressure mechanism, complete all as specified and directed. | 783.00 | Ten Sqm |
| 4 | M&L for 30mm consolidated thickness Bituminous Premix Semi Dense Asphaltic Concrete (SDAC) using paving bitumen VG-30 with 5.5 % binder by weight of total mix using Job Mix Formula (Design Mix) including mixed with waste plastic @ 6 % to 8 % of weight of bitumen as per clause 5.2 of SP 98-2013, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 508 of MoRTH & IRC specifications , complete all as specified and directed. | 603.00 | Ten Sqm |
| 5 | M&L for 40mm consolidated thickness Bituminous Premix Semi Dense Asphaltic Concrete (SDAC) using paving bitumen VG-30 with 5.5 % binder by weight of total mix using Job Mix Formula (Design Mix) including mixed with waste plastic @ 6 % to 8 % of weight of bitumen as per clause 5.2 of SP 98-2013, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller as per clause 508 of MoRTH & IRC specifications , complete all as specified and directed. | 180.00 | Ten Sqm |
6 Days Left