| Tender ID | 4450107 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Construction Of Divisional Office Building Of Irrigation Division Firozabad Situated At Distt. -firozabad |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 05 Jun, 2026 |
| Document Cost | 5879.00 |
|---|---|
| EMD | 987000.00 |
| Estimated Cost | 49346000.00 |
| City | Firozabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in foundation in ordinary soil including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches:(Building) as per direction of Engineer-in-charge . | 657.32 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) as per direction of Engineer-in-charge . | 112.97 | Cum |
| 3 | Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. 8, 10,12,16,20 mm dia bar as per direction of Engineer-in-charge . | 80387.06 | kg |
| 4 | Centering and shuttering including strutting, propping etc. and removal ofform for :Foundations, footings, bases of columns, etc. for mass concreteas per direction of Engineer-in-charge . | 158.34 | sqm |
| 5 | Centering and shuttering including strutting, propping etc. and removal ofform for : Columns, Pillars, Piers, Abutments, Posts and Strutsas per direction of Engineer-in-charge | 857.40 | Sqm |