Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Directorate Of Urban Local Bodies
Tender ID4030787
Organisation NameDirectorate Of Urban Local Bodies
Tender BriefConstruction Of Rcc Drain And Cc Road In The Unpaved Lane From Neetu Prajapati To Netrapal, Dr. Manpal To Netrapal Kushwah, Dhamendra Kushwah To Rinku Kushwah In Ward No. 29 Kotla Road Vijay Pal Garden.
Last Date For Submission6th May, 2026
Opening Date06 May, 2026
Cost
Document Cost5797.00
EMD490729.00
Estimated Cost4907286.00
Location
CityFirozabad
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate)1955.63Cum
2Class-150 (Non Modular) brick work in 1:4 Cement and Fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (Fine sand not less than in 1.25 FM) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1 A spec. No. 6.1.1 A)8.28Cum
3Providing and laying cement concrete in 1:48 Providing and laying cement concrete in 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in Foundation and floors. (PWD SOR 2025-26 Chapter No-05 Item No. 3 Spec. No.4.1242.40Cum
4RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 )42.00Cum
5R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWDSOR 2022-23 Chapter No-05 Item No. 5.2spec. No. 5.2.2)50.40Cum
6th May, 2026