Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4403894 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Upgradation Of Various Link Road At Gadoora And Kujjar Under Cnt-machine Mix Laid With Paver. |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 1100.00 |
|---|---|
| EMD | 78120.00 |
| Estimated Cost | 3906000.00 |
| City | Ganderbal |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Engagement of JCB for scrafying and clearing of Debriis, Malba, excavation of various works such as removal of surplus unhygenic material etc and disposal of same by engaging of lorry etc all complete as per directions of Engineer Incharge. | 18.00 | Hrs. |
| 2 | Supply, stacking and laying of WBM grade 2nd with specified graded stone aggregate 63mm - 45mm size broken quarry stone @0.92cum/10 sqm and using of screening 11.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid. | 9.58 | Cum |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 155.35 | Cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications incl. all carriage etc complete. On WBM surface @0.75kg/sqm. | 2372.50 | Sqm |
| 5 | On BT surface @0.50kg/sqm. | 1478.00 | Sqm |
1 Days Left