Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3885383 |
|---|---|
| Organisation Name | Urban Development And Urban Housing Department |
| Tender Brief | Corrigendum : Providing, Lowering, Laying, Jointing, Testing And Commissioning Of Drainage Pipeline For Meghpar (borichi & Kumbhardi) Area With Pump House And Rising Main Line Under Gandhidham Municipal Corporation. (3rd Attempt) |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 23500.00 |
|---|---|
| EMD | 8621798.00 |
| Estimated Cost | 100.00 |
| City | Gandhidham |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole) 0.0 to 1.50 m. depth, Excavation of Foundation in Soft Murrum | 93240.000 | CMT. |
| 2 | Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole) 0.0 to 1.50 m. depth, Excavation of Foundation in and Hard Murrum | 139860.000 | CMT. |
| 3 | Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole) 0.0 to 1.50 m. depth, Excavation of Foundation in Soft Rock | 233100.000 | CMT. |
| 4 | Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole)1.5to 3.00 m. depth, Excavation of Foundation in Soft Rock | 99920.000 | CMT. |
| 5 | Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole)1.5to 3.00 m. depth, Excavation of Foundation in and Hard Rock | 99920.000 | CMT. |
19 Days Left