Tendering Authority: Urban Development And Urban Housing Department
Tender ID3885383
Organisation NameUrban Development And Urban Housing Department
Tender BriefCorrigendum : Providing, Lowering, Laying, Jointing, Testing And Commissioning Of Drainage Pipeline For Meghpar (borichi & Kumbhardi) Area With Pump House And Rising Main Line Under Gandhidham Municipal Corporation. (3rd Attempt)
Last Date For Submission20th Apr, 2026
Opening DateRefer to Documents
Cost
Document Cost23500.00
EMD8621798.00
Estimated Cost100.00
Location
CityGandhidham
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole) 0.0 to 1.50 m. depth, Excavation of Foundation in Soft Murrum93240.000CMT.
2Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole) 0.0 to 1.50 m. depth, Excavation of Foundation in and Hard Murrum139860.000CMT.
3Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole) 0.0 to 1.50 m. depth, Excavation of Foundation in Soft Rock233100.000CMT.
4Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole)1.5to 3.00 m. depth, Excavation of Foundation in Soft Rock99920.000CMT.
5Excavation for pipe line trenches etc. for all with shoring and strutting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. (Pipe AND Manhole)1.5to 3.00 m. depth, Excavation of Foundation in and Hard Rock99920.000CMT.